The processing facility is a 125' x 300' gable building with a 4:12 roof pitch. Thanks to VP’s Fast Track program we were able to get materials on-site quickly and complete this building in time for the scheduled install of the company’s equipment. 

Steel is in the air
—  Steel is in the air  —
Vapor barrier and banding are being installed
—  Vapor barrier and banding are being installed  —
—    —
—    —
—    —
—    —
—    —
—    —